Pine Grove Middle School

The $36 million renovation of Pine Grove Middle School was completed in December 2024. Close collaboration between Oak, the design team, and the Owner was essential to developing and executing a thoughtful phasing plan that allowed school operations and daily instruction to continue throughout construction. Originally built in 1974, the school’s open-concept classrooms no longer met modern educational needs or current safety standards. This transformative project delivered much-needed security upgrades, a centralized media center, a full systemic renovation, and refreshed interior finishes — all while maintaining occupant safety through careful phasing and preserved egress routes.

Chris Morton

Oak’s project managers, superintendents and field support employees were always going the extra mile

to ensure the success of the project and took extraordinary steps to make sure the facilities staff was included and comfortable throughout the construction process. Your staff thoroughly understands the relevant issues in the construction of modern school facilities and utilizes the latest technology available to streamline the process.

Center of Applied Technology – North

The Center of Applied Technology – North project will be completed in 2027. Oak Contracting is providing complete Construction Management Agency Services with a budget of $94 million. This building is being constructed on a campus with an occupied High School and Middle School. Site logistics planning with the design team, Owner and major stakeholders was of utmost importance in the preconstruction phase of this project.

Blue Heron Elementary School

Blue Heron Elementary School was constructed as a new school to help support the growing population of the New Market community. The design and construction provide students with innovative, flexible, and technology-rich learning spaces. The new building is nestled into a hill, utilizing the grade change to separate administrative spaces and classrooms. Collaborative space is a main priority for the school, so opportunities for open gathering areas were provided where corridors intersect. This project achieved LEED Silver certification.

Guilford Park High School

Guilford Park High School was completed in 2023 with a budget of $104 million. Oak Contracting provided complete Construction Management Agency Services. Oak Contracting was honored as the Overall Building Winner by Building Congress & Exchange at the 2024 Craftsmanship Awards for our exceptional work on Guilford Park High School.

Quarterfield Elementary School

Quarterfield Elementary School is a replacement building that was constructed on an occupied site while the existing building remained operational. The the new building is located in the back of the site, where a clearance of approximately 30’ from the existing building was managed during construction. Oak worked closely with the design team and AACPS to phase the construction of the new building, demolition of the existing building and installation of parking and site elements to maintain school and site functions at all times. After the existing school was demolished an additional curb cut was installed for the bus loop to provide for better separation of vehicular traffic on-site.

Somerset County Technical High School

The new Somerset County Technical High School was a replacement building for the County’s previous Tawes Technical High School. The new site presented the challenge of relocating an electrical line that fed the adjacent police precinct. The new building design included many unique construction materials and techniques, including a pre-engineered metal building that connected to a steel frame structure where special expansion joints between the two systems were utilized. Oak Contracting worked tirelessly with the design team and Somerset County Public Schools to successfully address and resolve unforeseen conditions during construction.

Waverley Elementary School

Waverley Elementary School was completed in 2022. Oak Contracting provided complete Construction Management Agency Services. The replacement school, with a budget of $42 million, was constructed under the supervision of Senior Project Manager Dave Toth and Superintendent Tony Sabatelli.

George Cromwell Elementary School

George Cromwell Elementary School was an addition and renovation project to an existing school in Anne Arundel County. The project consisted of two construction phases. Phase 1 of the project was a 35,200 square feet addition, and included new mechanical and electrical rooms, new gymnasium, cafetorium, and support space. After construction of the addition, the rest of the school was renovated, including all classrooms. The existing cafeteria/kitchen was turned into the school’s new media center. The school remained open to students during construction. Oak worked with the Owner and design team to successfully phase the construction to not disrupt school operations.

Wilde Lake Middle School

Wilde Lake Middle School is Maryland’s first Net Zero and LEED Platinum public school. The new replacement building was constructed on the existing building site which remained operational during construction. Oak worked closely with the school to communicate the new and different operations that were expected and required to operate a Net Zero school. Extensive testing, specifically in regards to the building envelope, and critical attention regarding the installation and commissioning of the mechanical and electrical systems was needed due to the stringent LEED Platinum requirements.